Pancho’s Mexican Restaurant

Downtown Summerlin, NV
Completed: October, 2015
Ground up, two-level gourmet Mexican restaurant. Heavily themed in lavish, old world-Mexico style, complete with popular cantina and a rustic outdoor patio waiting area.

10,500 sq. ft.
CLIENT: Pancho’s

 

Children of America

Richmond, Virginia
Completed: December, 2014
Freestanding building for tenant child care in West Broad Village. Work included site paving, landscape, underground utilities and play structures.

10,000 sq. ft.
CLIENT: Excel Trust

 

Outlets at the Border Shopping Mall

San Diego, CA
Completed: October, 2014
All new, ground-up, outdoor shopping mall with 46 tenants. Extensive site improvements.

140,000 sq. ft.
CLIENT: The Shamrock Group

 

Sport Chalet – 7th and Fig

Downtown Los Angeles
Completed: July 1, 2013
NextGen Sport Chalet Prototype sporting goods store. Project received the ICSC United States Design and Development Silver Retail Design Award.
CLIENT: Sport Chalet

 

Plaza at the Border – Ross & TJMaxx

San Ysidro, CA
Completed: Fall 2013
Shell construction and tenant improvement of new Ross and TJMaxx stores.
CLIENT: The Shamrock Group

 

Dicks Sporting Goods and Petsmart – Red Rock Commons

St. George, UT
Completed: May 2012
Shell construction tenant improvement for 45,000sf Dick’s Sporting Goods and 12,200sf Petsmart,
CLIENT: Excel Trust, Inc.

 

Red Rock Commons

St. George, UT
Completed: May 2012
Ground-Up Design Build Retail Development Including Build-To-Suit Stores for National Retailers, Dick’s Sporting Goods, and PetSmart
CLIENT: Excel Trust, Inc.

 

Anaheim Gardenwalk Theater

Anaheim, CA
Completed: August 2010
3-Level steel and concrete shell building of approximately 150,000sf intended use for a future theater, bowling alley, restaurant/retail
CLIENT: Excel Realty Holdings, LLC

 

Sport Chalet Bakersfield

Bakersfield, CA
COMPLETED: May 2007
Tenant Improvement in existing shell space to accommodate an all new Sport Chalet store
CLIENT: Sport Chalet, Inc.

 

Sport Chalet Metro

Phoenix, CA
COMPLETED: May 2007
Tenant Improvement in existing shell space to accommodate an all new Sport Chalet store
CLIENT: Sport Chalet, Inc.

 

Harbor Square –Liberty Station Retail Shops

Point Loma – San Diego, CA
COMPLETED: April 2007
Four individual retail shell buildings totaling approx. 50,000sf. Major site improvements including high-end hardscape and landscape areas.
CLIENT: McMillin Commercial

 

San Miguel Ranch Shops/On & Off Site Improvements

Chula Vista, CA
COMPLETED: June 2007
Construction of single level shops including selected vanilla tenant improvement build-outs supporting parking lot facilities. Extensive hillside excavations and retaining walls were also required for the developer of this project.
CLIENT: McMillin Commercial

 

Sport Chalet

Thousand Oaks, CA
COMPLETED: September 2006
Construction of all new ground-up masonry retail building and tenant improvement. Also included is an exterior pool and scuba facility.
CLIENT: Sport Chalet, Inc.

 

Northgate Market Remodel Store #16

Anaheim, CA
COMPLETED: May 2007
Remodel and expansion of existing retail store while operations were on-going
CLIENT: Gonzales Markets

 

Butterfield Station On-Site Improvements and Shop Buildings

Temecula, CA
COMPLETED: February 2007
Complete site development from rough grading through finish improvement for the parking and landscaping areas. Free standing shop buildings of approx. 10,000sf
CLIENT: Vail Associates, Inc.

 

Butterfield Station Best Buy and Office Max

Temecula, CA
COMPLETED: February 2007
Complete site development from rough grading through finish improvement for the parking and landscaping areas. Free standing shop buildings of approx. 80,000sf
CLIENT: Vail Associates, Inc.

 

Vail Ranch Plaza – Shops and Site

Temecula, California
COMPLETED: January 2005
This all new 20 acre site/retail development located in Temecula’s wine country includes 80,000sf tilt-up concrete and wood framed buildings. In addition to the high end retail buildings, there are extensive grading, paving and landscaping improvements on this site.
CLIENT: Kausay Redhawk, LLC

 

Las Americas, Phase II

San Diego, California
COMPLETED: July 2005
The second phase of this 50 acre retail shopping center located at San Diego, California/Tijuana, Mexico Border crossing. Open air shopping with architecture that blends the two cultures together, decorative arches, fountains and rotundas give this development a dynamic appearance.
CLIENT: JER Partners

 

Somersville Town Center (County East)

Antioch, California
COMPLETED: November 2004
Interior remodel of existing operational shopping mall. Removal and replacement of 50,000sf tile flooring, site demo, and preparation for new anchor building pad.
CLIENT: The Macerich Company

 

Sport Chalet Remodel

Pleasanton, California
COMPLETED: September 2004
New interior build-out of a previously occupied building, including new pool, dive shop, and second level mezzanine.
CLIENT: Sport Chalet, Inc.

 

Sport Chalet Remodel

Santa Anita Mall
Arcadia, California
COMPLETED: October 2004
Interior build-out of 40,000sf of mall retail space including extensive steel mezzanine construction.
CLIENT: Sport Chalet, Inc.

 

Vista Village Retail Shops & Site Improvements

Vista, California
COMPLETED: 2004
This project includes 90,000 sf of retail shop buildings in a “main street” design layout. It incorporates common areas, streets, extensive amenities, and parking lots.
CLIENT: Regency Centers

 

ACCO – San Leandro Corporate Campus Office Building & Fabrication Facility (A Design-Build Project)

San Leandro, California
COMPLETED: 2004
This project, located in the Bay Area, includes a 50,000 sf new office building of masonry and wood sheet construction. It also includes complete interior corporate offices built out, parking lot renovation, and complete 100,000 of turnkey duct work and piping shop fabrication facility.
CLIENT: ACCO Engineered Systems

 

Clairemont Town Square Site Improvements

Clairemont, California
COMPLETED: 2003
This work involves the renovation of an existing open air shopping center. It includes all new facia and soffit treatment to bring the design current. In addition, a complete repair and renovation of the 500,000 sf parking lot is also being done.
CLIENT: Donahue Schriber

 

Las Americas, Phase I

San Diego, California
COMPLETED: March 2002
This all new 360,000sf retail shopping center is located at the world’s busiest border crossing, San Diego, California/Tijuana, Mexico. Work includes steel frame building of different architectural styles, open mall common area with elaborate stained decorative concrete paving and extensive site development.
CLIENT: LandGrant Development

 

Sport Chalet at South Coast Plaza

Costa Mesa, California
COMPLETED: November 2001
Complete interior build-out with decorative concrete flooring and rock wall finishes. Over 40,000sf on the third floor location of this operating mall.
CLIENT: Sport Chalet, Inc.

 

Redhawk Town Center & Site Improvements

Temecula, California
COMPLETED: 2003
This mall, located near Temecula’s wine country, involves an all new “grass roots” site development of 50 acres, including grading, paving, site utilities, and major existing telephone line relocation. Total of 120,000 sf of high end retail shop buildings. In addition, the historic areas and western town buildings currently existing on the site are being restored for preservation and future use.
CLIENT: Price Legacy Corporation

 

New Escalators at Santa Monica Place Mall

San Diego, California
COMPLETED: November 2001
Addition of eight (8) new escalator units and new mall bridges in this operational or three (3) level shopping mall. All work is being performed at night allowing for only minimal disruption to the mall shopper.
CLIENT: The Macerich Company

 

Office Building Glendale and Service Center

Glendale, California
COMPLETED: November 2001
Two-story office building addition to existing facilities. Includes all interior improvements.
CLIENT: Air Conditioning Company, Inc.

 

Westside Pavilion Mall Renovation

Los Angeles, California
COMPLETED: November 2000
Remodel of the existing interior operating shopping mall. New marble floors with decorative lighting, painting, new handrailing, escalators,mall bridge widening, and MEP modifications.
CLIENT: The Macerich Company

 

Fashion Outlet of Las Vegas

Primm, Nevada
COMPLETED: July 1998
The construction of a single level mall building of 530,000 s.f., parking lot and on/off site work. This project was constructed as a joint-venture with C. W. Driver, Inc.
CLIENT: Fashion Outlet of Las Vegas and Associates

 

Ocean Place Regal Cinemas

Oceanside, California
COMPLETED: November 1999
Construction of a free-standing, single-level masonry theater.
CLIENT: DDR OliverMcMillan Oceanside LLC

 

Ocean Place Restaurant & Retail Shops

Oceanside, California
COMPLETED: November 1999
Construction of a single-level restaurant and retail shops.
CLIENT: DDR OliverMcMillan Oceanside LLC

“The Zone” Glendale Galleria

Glendale, California
COMPLETED: July 2000
Unique remodel of the existing interior operating shopping mall for Generation “Y” customers. New terrazzo floors with decorative lighting, painting, new handrailing, graphics, sound systems, and MEP modifications.
CLIENT: Glendale II Associates Ltd.

Buca di Beppo

Gas Lamp Quarter District – San Diego, California
COMPLETED: April 2000
Construction of a single-level restaurant and retail shop. New sidewalks and street improvements.
CLIENT: DDR OliverMcMillan GasLamp LLC

Sport Chalet – University Towne Centre

San Diego, California
COMPLETED: September 1999
Reconstruction of an existing theater building to accommodate a new tenant shop. Complex interior buildout.
CLIENT: Sport Chalet, Inc.

Parkway Plaza – Regal Cinemas

El Cajon, California
COMPLETED: November 1998
The construction of a new two-level theater shell and tenant improvement all within an existing mall building.
CLIENT: Regal Cinemas/TrizecHahn Centers

Valley Fair Mall Parking Deck ‘A’

San Jose, California
COMPLETED: November 1998
Mall parking facility for an operating shopping mall
CLIENT: Westfield, Inc.

Parking Deck – Park Meadows Mall

Denver, Colorado
COMPLETED: September 1998
Construction of a new parking structure and bridge connected to a department store. Deck finish to match rustic stone mall exterior.
CLIENT: Park Meadows Mall, Ltd.

Valley Fair Mall Renovation

San Jose, California
COMPLETED: November 1997
Remodel of the existing interior operating shopping mall. New marble floors with decorative lighting, painting, new handrailing, and miscellaneous MEP modifications.
CLIENT: Stevens Creek Associates

University Towne Centre Remodel

San Diego, California
COMPLETED: February 1998
The reworking of the existing Mall building and common area including concrete, fountains, lighting and tower amenities.
CLIENT: UTC Associates

Mall and Site Remodel – Park Meadows Mall

Denver, Colorado
COMPLETED: August 1998
Conversion of Mall common areas to tenant space and site modifications to accommodate a new parking structure and department store.
CLIENT: Park Meadows Mall, Ltd.

Office Building

Tustin, California
COMPLETED: September 1999
Office improvement and warehouse alteration.
CLIENT: Air Conditioning Company, Inc.

Office Building

San Diego, California
COMPLETED: September 2000
Interior improvements to existing shell office space.
CLIENT: Air Conditioning Company, Inc.

Office Building

Kent, Washington
COMPLETED: March 2000
Interior improvements to existing shell office space.
CLIENT: Air Conditioning Company, Inc.